Roads and Bridges

Top Projects Public Works Roads

Construction of Ikom-Ogoja-Katshina-Alla Road | Nigeria

1976 - 1978

Location of Project: Cross River/Benue

Employer / Client: Fed. Min. of Works & Housing  

Value($):

Earthworks, Concrete in Culverts & Drains, Kerbstone, Laterite Sub Base & Base Courses, Asphalt Pavement & Road Finishes. (200km)

RCC Nig.

Bridge on the Sassandra Rive | Ivory Coast

Apr-92  - Dec-94

Location of Project: Cote d'lvoire

Employer / Client: Ministry of Public Works

Value($):2,800,000

Performing Company:Sonitra, IC

200-m long bridge on a 40-m deep foundation in the river Civil engineering concrete structures - 1,800m Prestressed slab poured on the bank and pushed in place

San Pedro - Sassandra Road | Ivory Coast

 

Feb-88 -Jan-89

Location of Project: South West RCI 

Employer / Client: Ministry of Public Works 

Value($):7,200,000 

Performing Company:Sonitra, IC (50%)

Construction of tarred road, 72 kmEarthworks - 2,500 000 m3 Laterite - 400,000 m3 Stabilization cement - 12,500 ton. Sand asphalt - 64,000 ton. Civil engineering structures - 1 bridge of 60 ml, 800 m3 of concrete Drainage system- 2,100 m3 concrete Ducts- 1,900 ml Road marking - 8,000 m2

Rehabilitation of the Machakos Turnoff-Ulu-Sultan Hamud, Section of Nairobi-Mombasa Rd (A109) | Kenya

Jun-06 - Jun-12

Location of Project: Kenya National Highways Authority (KENHA) Blue Shield Towers, Hospital RoadP.O Box 49712-00100

Employer / Client: Ministry of Public Works

Value($):4,797,258,094.58

Performing Company: SBI AG

Name of Employer's Consultants & address: Nicholas O’Dwyer & Company in association with Abdul Mullick Associates Ltd2 Lower Hill RoadNairobiKenya.      

Rehabilitation of 55.25 km of existing road and construction of box culverts.

Pavement strengthening and traffic safety improvement of Chalinze –Segera-Tanga project, package 2: Kitumbe – Segera –Tanga (120km | Tanzania

Jan-11  - Jul-13 

Employer / Client: Tanzania National Roads Agency (TANROADS) 3rd floor, Maktaba ComplexBibi Titi Mohamed RoadP.O. Box 11364, Dar Es SalaamTanzania

Value($):67,237,269,792.00 

Performing Company: SBI AG

Name of Employer's Consultants & address: Roughton International limited in association with   Niras and Data Consulting LtdP.O.BOX 5416       

Pavement strengthening and traffic safety improvement of 120 km road including sructures and ancillary works. 

Takoradi Thermal Power Plant, Civil works | Ghana

Apr 96  - May 98

Employer / Client: Volta River Authority Subcontracting for Stone & Webster International Project Corporation, USA

Financed by:  World Bank  

Value($):19,571,960

Name of Employer's Consultants & address: MottEwbank Preece, UK

Construction of buildings and civil works for a 300 MW power stationEarthworks - 744,'000 m3Reinforced concrete - 49,000 m3Asphaltic concrete - 12,000 tonConcrete surrounded pipes - 6,500 mPVC pipes - 42,900 mWater supply system

Tetteh Quarshie Interchange, Accra | Ghana

 

6.2.2003   -17.5.2005

Employer / Client: Ministry of Roads and Transport Ghana Highway Authority 

Financed by: African Development Bank   

Value($):9,930,530

Name of Employer's Consultants & address: Twum Boafo and Partners. 

Construction of an urban interchange in Accra including 5 km paved road and a bridge 38 m long, 29 m wideEarthworks - 220,000 m3Rock excavation - 50,500 m3Laterite - 37,500 m3 Crushed stone base - 28,600 m3Asphaltic concrete - 14,700 ton.Concrete works - 8,100 m3

Construction of Loko-Oweto Bridge and Approach Roads | Nigeria

2011 - 2015

Location of Project: Nassara/Benue

Employer / Client:  F.M.W., ABUJA 

Value($): 36,118,437,905.00

Construction of 1,970 LM 24 spans bridge with dual carriage reinforced concrete box girders supported on piles and piers and 24KM; Approach Roads with 450 MM pavement thickness, 2 layers of asphalt pavement, 825,500 M3 of earthworks, 3,650 M3 Concrete in culverts/retaining walls, associated drainage system. 

Road Development Program Phase II (RDPP2), Strengthening of Kikorongo-Katunguru and Equator Roads | Uganda

Apr-04 -Dec-06

Location of Project: Western Uganda

Employer / Client: Road Agency Formation Unit, Ministry of Works, Housing and Communication. Uganda

Financed by: IDA , World Bank   

Value: UgX 31,344,521,754

Performing Company: SBI   

Name of Employer's Consultants & address: RITES Ltd. in Association with Kagga & Partners Ltd.Plot 1, Sector 29,Gurgaoan-122001,India.  

Rehabilitation of 54km road 

Reconstruction of Priority Sections of the Northern Corridor Route. Package B: Masaka-Mbarara Road | Uganda

Jan-08  - Jul-12

Location of Project: South Western Uganda 

Employer / Client: National Authorising Officer, European Development Fund. Ministry of Finance, Planningand Economic Development 

Financed by: IDA , World Bank   

Value: €102m

Performing Company: RCC    

Name of Employer's Consultants & address: AIC Progetti in Association with Technital and SABA EngineeringVia della Camilluccia 589/c -00135 Rome(Italy). 

Reconstruction and widening of 154.5km of road  

Rehabilitation of Muganli-Yevlakh Road (M4) | Azerbaijan

May-10 - Apr-13 

Employer / Client: Ministry of Transportation, Azer Road Service OJS.72/4 U. Hajibeyov st. Baku AZ1010 Republic of Azerbaijan

Financed by: BNP Paribas Bank & Ashra    

Value($): 337,500,000.00

Performing Company: Shikun & Binui SBI Infrastructure Ltd.    

Rehabilitation of 144.8 km road including Culverts and Drainage Works, Construction and Rehabilitation of Concrete Bridges

Design and execution of Rehabilitation of the Water supply system, sewerage system and the water and waste water treatment plants | Romania

Oct-08 - Jul-11

Location of Project: city of Husi, Romania.  

Employer / Client: Ministry of Regional Development and Tourism via the National Company for Investments.

Financed by: 78% Council of Europe Development Bank and 22% Local Content     

Value: 9.884.000 Euro  

Performing Company: SOLEL BONEH INT. ROMANIA SRL.     

Rehabilitation of water supply system included a new catchment on river Prut, pumping stations, clarifiers, water treatment plant with sand and coal rapid filters, storage tanks and extension of distribution pipes.Rehabilitation of the waste water treatment plant for 35.000 PE and extension at the sewage system. 

Vrd Basilique Yamoussoukro | Ivory Coast

 

Jun-88 - Sept-89

Location of Project: Yamoussoukro

Employer / Client: Presidency of RCI

Value($):1,800,0007,100,000 US$

Performing Company: Sonitra, IC

Name of Employer's Consultants & address: Direction des Grands Travaux BP 945 - Abidjan

Development & drainage for monumental religious edifice